Compliance Timeline

(Final Rule 68 FR 32172)

Note: 

  1. These timelines do not take into account special situations such as compliance extensions.
  2. A new affected source is an affected source that the construction or reconstruction of which is begun after July 11, 2002 [63.4282(e)]

Compliance Timeline for Existing Sources:

Event

Timeline

Effective Date

May 29, 2003 [68 FR 32172]

Submit Initial Notification

Note: A Title V permit application may be used in lieu of the initial notification, provided that the information specified in 63.9(b) is included, the State has an approved Part 70 operating permit program, and the State has received delegation of authority from EPA.

May 29, 2004 [63.4310(b)]

 

Compliance Date

May 29, 2006 [63.4283(b)]

Area source that becomes a Major Source: May 29, 2006 or one year after the area source becomes an existing major source, whichever is later [63.4283(c)(2)]

Conduct Initial Compliance Demonstrations

Applies to all compliance options:

  • Compliance coatings option,
  • Emission rate without add-on controls option,
  • Emission rate with add-on controls option,
  • Organic HAP overall control efficiency option, and
  • Oxidizer outlet organic HAP concentration option.

 

June 30, 2006 for the Compliant Material Option [63.4320].  The initial compliance demonstration includes calculations and supporting documentation showing that during the initial compliance period the organic HAP content of each coating and printing material and the mass fraction of organic HAP in each slashing, dyeing and finishing material applied did not exceed the applicable limit in Table 1 and that only thinners and cleaners with no organic HAP were applied to coating and printing web operations.

May 31, 2007 for the Emission Rate without Add-On Controls Option [63.4330].  The initial compliance demonstration includes calculations and supporting documentation showing that during the initial compliance period the organic HAP emission rate for web coating/printing operations and the mass fraction organic HAP for dyeing/finishing operations was less than or equal to the applicable limit in Table 1.

May 31, 2007 for the Emission Rate with Add-On controls Option [63.4340(b)(3)].  The initial compliance demonstration includes results of the performance test or liquid/liquid material balance, if applicable; calculations and supporting documentation showing that during the initial compliance period the organic HAP emission rate was less than or equal to the applicable limit in Table 1; the operating limits established during the performance test and results of the continuous parameter monitoring; and documentation of whether a work practice plan was developed and implemented.

June 30, 2006 for Organic HAP Overall Control Efficiency and Oxidizer Outlet Organic HAP Concentration Options [63.4350(b)(3)].  The initial compliance demonstration includes results of the performance test or liquid/liquid material balance, if applicable; calculations and supporting documentation showing that during the initial compliance period the organic HAP overall control efficiency was greater than or equal to the applicable limit in Table 1 or the oxidizer outlet  organic HAP concentration was no greater than 20 ppmw on a dry basis and the capture system efficiency was 100 percent; the operating limits established during the performance test and results of the continuous parameter monitoring; and documentation of whether a work practice plan was developed and implemented.

Submit Notification of Intent to Conduct a Performance Test

Note: Applies to add-on controls option only.

By September 26, 2006 [63.7(b) and 63.9(e)]

Conduct Performance Test

Note: Performance tests must be performed for each capture system and add-on control device, except for solvent recovery systems.

By November 25, 2006 [63.4340(b)(1) and 63.4350(b)(1)]

Conduct Liquid/Liquid Material Balance

Note: For solvent recovery systems, the first material balance must be initiated.

By May 29, 2006 [63.4340(b)(1) and 63.4350(b)(1)

Develop and Implement Work Practice Plan

By May 29, 2006 [63.4340(b)(2) and 63.4350(b)(2)]
Results of Initial Performance Test No later than January 24, 2007 [63.4311(b)
Notification of Compliance Status

July 30, 2006 for the Compliant Material, Organic HAP Overall Control Efficiency, and Oxidizer Outlet Organic HAP Concentration Options [63.4310(c)]

June 30, 2007 for the Emission Rate without Add-On Control and Emission Rate with Add-On Control Options [63.4310(c)]

Semiannual Compliance Reports

Note: The initial semiannual report must cover the period beginning on the day after the end of the initial compliance period and ends on June 30 or December 31, whichever date is the first date six months following  the end of the initial compliance period [63.4311(a)(1)].

No late than July 31 or January 31, whichever date is the first date six months after the end of the initial compliance period, and semiannually thereafter [63.4311(a)(1)]

 

Compliance Timeline for all New or Reconstructed Sources

Event

Timeline

Effective Date

May 29, 2003 [68 FR 32172]

Submit Initial Notification

Note: A Title V permit application may be used in lieu of the initial notification, provided that the information specified in 63.9(b) is included, the State has an approved Part 70 operating permit program, and the State has received delegation of authority from EPA.

Within 120 days from start-up or September 26, 2003, whichever is later [63.4283(a)]

 

Compliance Date

Upon start-up, or May 29, 2003, whichever is later [63.4283(c)(1)]

Area Source that becomes a Major Source:  May 29, 2003 or upon becoming a new major source, whichever is later [63.4283(c)(1)]

Conduct Initial Compliance Demonstrations

Applies to all compliance options:

  • Compliance coatings option,
  • Emission rate without add-on controls option,
  • Emission rate with add-on controls option,
  • Organic HAP overall control efficiency option, and
  • Oxidizer outlet organic HAP concentration option.

June 40, 2003 or the last day of the first full month after startup, whichever is later for the Compliant Material Option [63.4320].  The initial compliance demonstration includes calculations and supporting documentation showing that during the initial compliance period the organic HAP content of each coating and printing material and the mass fraction of organic HAP in each slashing, dyeing and finishing material applied did not exceed the applicable limit in Table 1 and that only thinners and cleaners with no organic HAP were applied to coating and printing web operations.

May 31, 2004 or the last day of the 12th full month after startup, whichever is later for the Emission Rate without Add-On controls Option [63.4330].  The initial compliance demonstration includes calculations and supporting documentation showing that during the compliance period the organic HAP emission rate for web coating/printing operations and the mass fraction organic HAP for dyeing/finishing operations was less than or equal to the applicable limit in Table 1.

May 31, 2004 or the last day of the 12th full month after startup, whichever is later, OR the date you conduct the performance test OR the date you conduct liquid/liquid material balance, if required, for the Emission Rate with Add-On Controls Option [63.43400(a)(3)]

June 30, 2003 or the last day of the first full month after startup, whichever is later, for the Organic HAP Overall Control Efficiency and Oxidizer Outlet Organic HAP Concentration Options [63.4350(b)(3)].  The initial compliance demonstration includes results of the performance test or liquid/liquid material balance, if applicable; calculations and supporting documentation showing that during the initial compliance period the organic HAP overall control efficiency was greater than or equal to the applicable limit in Table 1 or the oxidizer outlet  organic HAP concentration was no greater than 20 ppmw on a dry basis and the capture system efficiency was 100 percent; the operating limits established during the performance test and results of the continuous parameter monitoring; and documentation of whether a work practice plan was developed and implemented.

Submit Notification of Intent to Conduct a Performance Test

Note: Applies to add-on controls option only.

By September 26, 2003 or within 60 days before the performance test is scheduled to begin, whichever is later [63.7(b) and 63.9(e)]

Conduct Performance Test

Note: Performance tests must be performed for each capture system and add-on control device, except for solvent recovery systems.

By November 25, 2003 or 180 days after startup, whichever is later [63.4340(a)(1) and 63.4350(a)(1).

Conduct Liquid/Liquid Material Balance

Note: For solvent recovery systems, the first material balance must be initiated.

By May 29, 2003 or  startup, whichever is later [63.4340(a)(1) and 63.4350(a)(1)]

Develop and Implement Work Practice Plan By May 29, 2003 or startup, whichever is later [63.4340(a)(2) and 4350(a)(2)]
Results of Initial Performance Tests

By January 24, 2004 or 60 days after completing the performance test, whichever is later [63.4311(b)]

Notification of Compliance Status

No later than 30 days following the end of the initial compliance period for Compliant Material, Organic HAP Overall Control Efficiency, and Oxidizer Outlet Organic HAP Concentration Options [63.4310(c)].  The initial compliance period begins on the compliance date and ends on the last day of the first full month after the compliance date [63.4320 and 63.4340(a)(3) and (b)(3)]

No later than 30 days following the end of the initial compliance period for Emission Rate without Add-On Control and Emission Rate with Add-On Control Options [63.4310(c)].  The initial compliance period begins on the compliance date and ends on the last day of the 12th full month after the compliance date [63.4330] or the later of the last day of the 12th full month after the compliance date, the date the performance test is conducted or the date the liquid/liquid material balance is initiated, whichever is later [63.4340(a)(3) and (b)(3)]

Semiannual Compliance Reports

Note: The initial semiannual report must cover the period beginning on the day after the end of the initial compliance period and ends on June 30 or December 31, whichever date is the first date six months following  the end of the initial compliance period [63.4311(a)(1)]

No later than July 31 or January 31, whichever date is the first date six months after the end of the initial compliance period, and semiannually thereafter (63.4320(a)(1)]